US 64 Status Report

US 64 Nash County – Interchange at I-95 and Sunset Ave. (U-5026)

  • Deliverable
  • Total cost: $46.499 million (National Highway Program) Division Tier
  • Unfunded: $0
  • Right of Way – Beginning 2019 ($12 million)
  • Construction – Beginning 2019 ($33.399 million)

Project Manager Roadway:

US 64 Nash County – Widen Bridge at Old Carriage Rd. (U-5995)

  • Not Deliverable
  • Total cost: $14.2 million (NC Highway Trust Fund)  Division Tier
  • Unfunded: $0
  • Right of Way / Utilities – 2023 ($3.3 million)
  • Construction – 2025 ($10.92 million)

Project Manager Roadway:

US 64 Alternate – Replace Bridge No. 29 over the Tar River (B-5670)

  • Not Deliverable
  • Total cost: $5.165 million (Highway Fund Bridge Program)
  • Unfunded: $0
  • Environmental Document – October 2021
  • R/W Acquisition – 2023 ($465,000)
  • Construction – 2024 ($4.65 million)

Project Manager Roadway: John Conforti, REM (919) 707-6015 jgconforti@ncdot.gov

US 64 Tyrrell County – Rehab Bridge over Alligator River (B-5936)

  • Not Deliverable
  • Total cost: $10.725 million (Undetermined) Statewide Tier
  • Unfunded: $0
  • Construction – 2025 ($10.725 million)

Project Manager Roadway:

US 64 Columbia to East of Alligator River (R-2545 AA, AB, B)

  • Not Deliverable
  • Total cost: $615.791 million (NC Highway Trust Fund)
  • Unfunded: $611.59 million
  • Currently not programmed in the 2018 – 2027 STIP

Utilities:

  • Segment AA – Unfunded ($1.395 million)
  • Segment AB – Unfunded ($1.611 million)
  • Segment B – Unfunded ($1.156 million)

R/W Acquisition:

  • Segment AA – Unfunded ($1.825 million)
  • Segment AB – Unfunded ($2.025 million)
  • Segment B – Unfunded ($3.175 million)

Construction:

  • Segment AA – Unfunded ($24.8 million)
  • Segment AB – Unfunded ($72.5 million)
  • Segment B – Unfunded ($503.1 million)

Project Manager: Brian Yamamoto, P.E. (919) 707-6051 byamamoto@ncdot.gov

US 64 East Lake to Manns Harbor (R-2544 A, B, C)

  • Not Deliverable
  • Total cost: $98.934 million (NC Highway Trust Fund)
  • Unfunded: $90.6 million
  • Currently not programmed in the 2016 – 2025 STIP

Utilities:

  • Segment A – Unfunded ($315,000)
  • Segment B – Unfunded ($1.401 million)
  • Segment C – Unfunded ($1.86 million)

R/W Acquisition:     

  • Segment A – Unfunded           ($1.175 million)
  • Segment B – Unfunded           ($1.35 million)
  • Segment C – Unfunded           ($300,000)

Construction:

  • Segment A – Unfunded  ($14.7 million)
  • Segment B – Unfunded ($23.3 million)
  • Segment C – Unfunded ($46.2 million)

Project Manager: Brian Yamamoto, P.E. (919) 707-6051 byamamoto@ncdot.gov

US 64 Dare County – Rehab Bridge over Croatan Sound (B-5943)

  • Deliverable
  • Total cost: $2.45 million (NC Highway Trust Fund)  Statewide Tier
  • Unfunded: $0
  • Construction – 2017 ($2.4 million)

Project Manager Roadway: